House progress

House progress June 2015

Here are the pictures starting where they left off at the end of May with the framing just starting on the garage. It is an L building with one end at an angle. The weather has been kind but is currently extremely hot. 

garage

sheathing the east wall

garage

finishing the sheathing of the east wall

A flat surface is needed for framing and so everything that needs this part of the garage floor is being framed before any wall go up.

garage

building frame for west wall on top of east wall

garage

south end wall is framed being built on top of other two walls

garage

cutting wood for the frame of the gable end

garage

cutting the angles for the gable end

garage

the frame of the west gable end finished

The two other wall frames and the gable ends were moved out for the time being. Now the east wall can be prepared for lifting.

garage

west wall has its ‘umbrella’ skin put on

garage

putting the battens for the siding on the west wall

The wall is prepared for safe lifting. At first we were going to use the car to pull it up. Then we realized that it was not that heavy and will help we could lift it manually. We made a date with Paul Henri and our two neighbours Sylvain and Sebastien for a Saturday. They came a 11 am and the job was finished for them to go home for lunch – smooth job without a hitch.

garage

hinges, rope to pull with from safe distance, adjustable rod to go on stake in ground

garge

ropes on each side the right length to prevent the wall going too far

garage

3 helpers arrived at 11 am and were done and left by lunch

The three lifted from the inside, I pulled on a rope with a safe distance and tied the rope when it was up. Harry pulled on the rod and got it onto the stake in the ground and then adjusted its length until the wall was plumb.

garage

the west wall in place

garage

feeling good that all went very smoothly

Then came the frames for the other two walls which were lighter because they were just frames.

garage

fixing the south end wall to the east wall

garage

discussing which way the west wall should sit

garage

west wall in place

When the helpers left, Harry stabilized the two frames.

garage

sheathing the south end

garage

south end and west wall sheathed

Now the work became on the walls of the other part of the L. First we needed the exact dimensions of the door so we bought it. Good thing – the one we planned on was out of stock.

garage

purchased door so the size was known before building south wall

garage

preparing top and bottom plates for south wall – angle needed at one end

garage

south wall framed

Harry and I lifted it.

garage

south wall raised

garage

south wall with start of sheathing

 